Colocation in France

Your infrastructure, hosted with precision.

Power, rack space, network and IPv4 addresses are defined by the plan. Choose it, bring your hardware or rent Wayhost servers, then set the commitment term. VOLTANEUM immersion cooling.

  • Displayed monthly price
  • Reserved power
  • Your own or rented hardware
High-density server rack in a Wayhost infrastructure

VOLTANEUM

High-density immersion infrastructure

Choose a format

Published capacities. No hidden prices.

Subscription and setup fees are shown upfront. Electricity consumed and cooling are billed separately.

Verifying prices…

An informed decision

From requirements to activation.

Wayhost confirms the exact site and installation date.

  1. 01

    Offer

    You choose the plan: power, rack space, network and IPv4 addresses included.

  2. 02

    Hardware and commitment

    You bring your servers or rent Wayhost’s, then choose the commitment term.

  3. 03

    Activation

    Wayhost confirms the site and installation date, then installs the hardware.

What is planned

Everything is defined by the plan.

Each plan’s details (power, rack space, network, prices per commitment term) are on its page.

Power

Power reserved by the plan, with optional extra power in kW steps.

Network

Port, bandwidth, IPv4 and IPv6 addresses and DDoS protection depending on the plan.

Hardware

Your servers, or servers from the Wayhost catalogue rented monthly. Purchase on request only.

Installation

Wayhost confirms the site and installation date.

FAQ

Answers before you commit.

Key information on compatibility, billing and activation.

What is included in the monthly colocation price?

The price includes the rack space, reserved power, network and IP addresses defined by the plan, according to the chosen commitment term. Electricity consumed and cooling are billed separately.

Is my equipment compatible with immersion cooling?

Customer equipment is accepted after immersion-readiness validation. Wayhost checks the configuration, materials and operational constraints before installation.

How are electricity and cooling billed?

Electricity consumed and immersion cooling are billed separately, at the rates shown on each plan’s page.

What happens after configuration?

After payment, Wayhost places the order in technical validation and confirms site capacity, hardware compatibility, network requirements and the installation date.